Permit from EPA protects Idaho’s water quality

 Resize text        

Boise, Idaho — A new water discharge permit for Concentrated Animal Feeding Operations (CAFOs) will help protect Idaho’s rivers, lakes and streams from animal waste, according to the U.S. Environmental Protection Agency in Boise, Idaho. The new EPA "General Permit” regulates discharges to surface waters from most Idaho CAFOs, including those on tribal lands. The permit covers a wide array of Idaho livestock operations, not only beef cattle and dairy cows, but also horses, sheep, pigs and poultry.

Many CAFO operations in Idaho are well managed to protect against harmful discharges of animal wastes. Runoff from CAFOs can discharge manure, litter, and process waste water into streams, lakes or other surface waters causing not only serious environmental harm, but also exposing people to pathogens.

CAFO runoff or over-application of manure can harm water quality, damage habitat and cause fish kills by introducing excessive nutrients to rivers and streams. Groundwater can also be harmed, when pharmaceuticals and nutrients seep through the soil and contaminate aquifers that many Idahoans depend on for drinking water.

According to Mike Bussell, Director of EPA’s office of Water and Watersheds in Seattle, the Agency is reaching out to help CAFO owners or operators understand why they need to apply for the permit if they expect to discharge to a nearby stream, creek, lake or river.

“This permit will give producers the certainty they’ve been seeking,” said Mike Bussell, “Our message is clear: If you operate a CAFO and there’s runoff from pens, feed and manure storage areas, or areas where manure is spread, you need a permit.”

Operations covered by the new general permit include:

  • any animal feeding operation that either meets the EPA definition of a CAFO, or designated a CAFO by EPA; and
  • any CAFO that discharges to surface water from where animals are confined or manure and wastewater is spread.

In addition to the standard permit application, CAFO owners and operators must submit a nutrient management plan for EPA’s initial review. The EPA reviews these documents and will make them available for public comment before granting permit coverage.

CAFOs that have had permits in the past and wish to have continued coverage under the new permit, or CAFOs that discharge, will have 90 days after May 9, 2012 (effective date), to apply for their permit, submit their plan for review and obtain coverage under the new permit.

EPA will continue to work with the state of Idaho, tribal and local governments, environmental groups and other interested parties to get the new permit in place, offer compliance assistance to producers and safeguard Idaho’s water for the future.

For more about the new permit, please visit: http://www.epa.gov/region10/water/npdes/generalpermits.html


Related Articles

No matching related articles at this time.

Sponsored Links


Comments (1) Leave a comment 

Name
e-Mail (required)
Location

Comment:

characters left

james    
USA  |  April, 12, 2012 at 10:37 AM

Protecting the enviroment and pulling the Arch coal mine water permit and shutting the open pit mine doesn't square with an America that is a world power. Next time a pro-communist administration is elected, all CAFOs that need water permits are at risk.
In California, a worthless river smelt was a stakeholder with greater rights to water than the farmers.
After we go communist all the way, you can bet the fish won't count for anything if the business owner is a dues paying communist party official first.


Feedback Form
Leads to Insight